Working draft

  1. General plan
    Situational plan
    Exploded view
    Land improvement plan
  2. AR. Architectural solutions at the RP stage
    Basic project decisions on plans, sections, facades.
    Preliminary specification.
    Details and nodes.
    Passport of exterior equipment of facades.
  3. KR. Design solutions at the RP stage.
  4. Measures of civil protection. (if necessary)
  5. OV. Heating, ventilation, air conditioning.
  6. VK. Cold and hot water supply, sewerage.
  7. ETR. Electrical solutions.
  8. SZ. Communication and signaling.
  9. KD. Estimated documentation. (if necessary, by additional order).