- General plan
Situational plan
Exploded view
Land improvement plan
- AR. Architectural solutions at the RP stage
Basic project decisions on plans, sections, facades.
Preliminary specification.
Details and nodes.
Passport of exterior equipment of facades.
- KR. Design solutions at the RP stage.
- Measures of civil protection. (if necessary)
- OV. Heating, ventilation, air conditioning.
- VK. Cold and hot water supply, sewerage.
- ETR. Electrical solutions.
- SZ. Communication and signaling.
- KD. Estimated documentation. (if necessary, by additional order).