- The master plan is at the project stage.
General plan.
Improvement of the territory.
Structures of coatings.
- AR. Architectural solutions at the P stage.
Basic project decisions on plans, sections, facades.
Preliminary specification.
Details and nodes.
Passport of exterior equipment of facades.
- KR. Design decisions at the P stage.
- Measures of civil protection. (if necessary)
- OV. Heating, ventilation, air conditioning.
- VK. Cold and hot water supply, sewerage.
- ETR. Electrical solutions.
- SZ. Communication and signaling.
- KD. Estimated documentation. (if necessary, by additional order).